Precision installation of Design for Manufacture and Assembly modules that compress programme time, raise quality and reduce on-site risk across Singapore developments.

Design for Manufacture and Assembly has redefined how modern Singapore projects are delivered. By shifting fabrication into controlled factory conditions and reserving the site for precise assembly, Avenix Engineering helps developers and main contractors achieve faster handover, tighter tolerances and measurably safer worksites. Our installation teams manage the full module lifecycle on the ground, from receiving and inspection through setting, alignment, structural connection and final commissioning. Every lift is planned around your construction sequence so that modules arrive, land and lock into place without disrupting the wider programme. ✓ Pre-installation survey and setting-out ✓ Module receiving, inspection and staging ✓ Crane and lifting plan coordination ✓ Precision alignment and leveling ✓ Structural bolting and welded connections ✓ Inter-module sealing and weatherproofing
From a single plant room module to a full volumetric structure, we deliver the on-site discipline that modular construction demands.
Volumetric & PPVC Modules
Installation of prefabricated prefinished volumetric construction units and structural modules to BCA standards and approved method statements.
MEP Module Integration
Connection and commissioning of the mechanical, electrical and plumbing services pre-installed within each module for a seamless handover.
Quality & Safety Assurance
Documented inspection, tolerance verification and risk-assessed method statements that protect both programme and people.
A disciplined, milestone-driven approach that keeps your project safe, on time and inspection-ready.
We verify site readiness, datum levels and bearing points before the first module arrives.
Modules are lifted to a pre-approved rigging plan and landed onto prepared supports.
Each unit is leveled, aligned and structurally connected to the design specification.
Joints are sealed and weatherproofed, then the installation is inspected and handed over.

Modular delivery only succeeds when the installation discipline on site matches the precision of the factory. Our supervisors, riggers and installers work to detailed method statements and BCA expectations, so the gains designed into your modules are fully realised. From a single plant room module to a full volumetric tower, we scale resources to suit and keep your consultants informed at every milestone with clear documentation and progress reporting. ✓ BCA-aligned installation practices ✓ Experienced rigging and lifting supervisors ✓ Detailed method statements and risk assessment ✓ Transparent milestone progress reporting